language
中国
韩国
韩国
韩国
韩国
韩国
NEWS
Ningbo Haishu YinLian Machinery Co.,Ltd

What are the installation methods of Bitzer 4PC piston kit

(Summary description)The above is the summary of the installation method of the Bitzer 4PC piston kit. I hope our summary will be helpful to you.

What are the installation methods of Bitzer 4PC piston kit

(Summary description)The above is the summary of the installation method of the Bitzer 4PC piston kit. I hope our summary will be helpful to you.

Information

1. Install the piston pin of the connecting rod into the pin hole of the Bitzer 4PC piston kit;

2. Install the piston ring into the ring groove on the piston;

Bitzer 4PC piston kit

3. Insert the installed connecting rod and piston into the cylinder from the top of the cylinder and the connecting rod head downwards, tighten the piston ring with a special clamp for installing the piston ring, and then gently push it into the cylinder liner;

4. The connecting rod shell of Bitzer 4PC piston kit is installed on the connecting rod journal, and its two fastening bolts, pay attention to the direction of the body;

5. Tighten the two bolts of the connecting rod tile to the required torque;

6. Install the cylinder head and adjust the valve clearance;

7. Install the oil pump and install the oil pan.

The above is the summary of the installation method of the Bitzer 4PC piston kit. I hope our summary will be helpful to you.

Keyword:

Scan the QR code to read on your phone

Search

搜索
Search

Specialized in manufacturing various air compressors, refrigerant compressor, patrol engine connecting rods, piston, aluminum die cast parts and cast aluminum.

Copyright © 2020 Ningbo Haishu YinLian Machinery Co.,Ltd All rights reserved.  Powered by www.300.cn  浙ICP备19046447号